Skip to content
EveryLoading
  • About EveryLoading
  • User manual
  • FAQ
  • Roadmap
  • Loading meter calculator
  • CBM calculator
  • Pallet fit calculator
  • Container size calculator
  • Chargeable weight calculator
  • Freight class calculator
  • Cartons in a container calculator
  • All free tools
Integrations
  • Road transport
  • Sea freight
  • Air cargo
  • Manufacturing
  • Palletizing
  • Retail and distribution
BlogContact
Log in
Create free account

About

  • About EveryLoading
  • User manual
  • FAQ
  • Roadmap

Use cases

  • Road transport
  • Sea freight
  • Air cargo
  • Manufacturing
  • Palletizing
  • Retail and distribution

Free tools

  • Loading meter calculator
  • CBM calculator
  • Pallet fit calculator
  • Container size calculator
  • Chargeable weight calculator
  • Freight class calculator
  • Cartons in a container calculator
  • All free tools
IntegrationsBlogContact
Create free account
Blog / Operations & software

Load Planning Software Integration with ERP, WMS and TMS

Load planning software integration explained: what data flows between ERP, WMS or TMS and the planner, file import vs REST API, and a step-by-step approach.

Operations & software · 19 November 2026 · 7 min read

A 3D EveryLoading load plan of 22 drinks Euro pallets and 8 snack half pallets in a 13.6 m semi-trailer

Planning your load?

See it fit in 3D before the truck arrives.

Create your free account

No card needed.

Load planning software integration means your ERP, WMS or TMS sends order lines and the vehicle to the planner and gets back where every item goes, without anyone retyping data. There are two practical routes: a file export from your system that a planner imports, which needs no development, and a REST API that your system calls directly. Start with files to prove the data is right, then move to the API when volume justifies the development work.

This article explains what data flows in each direction, how the two routes compare, and how to build an integration step by step. Where it describes EveryLoading, it sticks to what exists today: a REST API and CSV/XLSX import, not ready-made connectors for specific ERP or TMS products.

What data flows, and in which direction

The data a load planner needs is small and well defined. Most of the work is finding it in your systems and making sure it is correct.

Direction: To the planner

Data
Loading space: inside length, width, height, maximum payload, loading side
Usually comes from
TMS (vehicle or equipment master)

Direction: To the planner

Data
Items: id, name, length, width, height, weight, quantity
Usually comes from
ERP item master and order lines, or WMS picked handling units

Direction: To the planner

Data
Rules: stackable, floor only, rotation, maximum weight or loads on top
Usually comes from
ERP item master (often missing, add them)

Direction: To the planner

Data
Delivery stop per item
Usually comes from
TMS or route planner

Direction: Back to your system

Data
Placement of every item: x, y, z position, size as placed, orientation
Usually comes from
Planner result

Direction: Back to your system

Data
Volume utilisation, total weight, items that did not fit
Usually comes from
Planner result

Direction: Back to your system

Data
Centre of gravity, and per vehicle when several are used
Usually comes from
Planner result
DirectionDataUsually comes from
To the plannerLoading space: inside length, width, height, maximum payload, loading sideTMS (vehicle or equipment master)
To the plannerItems: id, name, length, width, height, weight, quantityERP item master and order lines, or WMS picked handling units
To the plannerRules: stackable, floor only, rotation, maximum weight or loads on topERP item master (often missing, add them)
To the plannerDelivery stop per itemTMS or route planner
Back to your systemPlacement of every item: x, y, z position, size as placed, orientationPlanner result
Back to your systemVolume utilisation, total weight, items that did not fitPlanner result
Back to your systemCentre of gravity, and per vehicle when several are usedPlanner result

Try it on a real load

Open the 3D planner with 14 Euro pallets, 6 industrial pallets and 24 cartons in a 13.6 m trailer, already arranged. Change any row to plan your own.

Plan this load in 3D

The weak spot is nearly always the item master. ERPs store sales units and weights, but not always the dimensions of the shipped handling unit, and almost never stacking rules. Fix that before writing any code; our guide to preparing a packing list for load planning lists the usual errors.

Route 1: file export and import

Most ERP and WMS systems can export an order or a shipment as CSV or Excel. The planner imports that file, the planner user optimises, adjusts and shares the plan. No developer is needed, and it is the fastest way to find out whether your data is good enough to automate.

In EveryLoading you can paste rows from Excel into the cargo table on any account, and Pro imports CSV and XLSX files with one item per row; the cargo tab has a template to download. See importing cargo for the columns. Set up a saved export (a report or query) in your ERP that produces those columns in that order, and the daily step becomes: export, import, optimise.

Good to know

The file route works in one direction. EveryLoading does not currently export a load plan as CSV or Excel; plans leave the planner as a PDF or a read-only share link. If you need the placements back in your own system, use the API.

Route 2: the REST API

With an API, your system sends the request and stores the answer. A TMS can check that an order fits the planned truck before confirming it; an ERP can estimate how many vehicles or containers an order needs as soon as it is entered; a WMS can turn picked order lines into a plan for the dock. The integrations overview describes these cases.

EveryLoading offers one REST API with JSON requests and responses, available to Pro accounts. Keys are created in the Developer portal and sent in the X-API-Key header. There are two endpoints:

  • POST /api/v1/optimize: send the loading space (length, width, height in cm, maxWeight in kg, optional loadingDirection), the items (size, weight, quantity, and optional stackable, floorOnly, rotationMode, shape, maxStackWeight, maxLoadsOnTop, standOn, stop) and optional settings such as sortStrategy. You get back placements, utilization, totalWeight, unplacedItems and the centre of gravity, plus a vehicles list when several vehicles or a truck-and-trailer set are used.
  • GET /api/v1/presets: standard loading spaces (20 ft and 40 ft containers, 40 ft high cube, Euro and mega trailer) with inside dimensions and payload. You can always send your own dimensions instead.

The API uses centimetres and kilograms. Positions are the corner of each item nearest the origin of the loading space. An optimisation request is calculated and returned, not saved as a plan, and PDFs and share links are made in the planner, not through the API. The Developer portal has the full field reference and examples in cURL, JavaScript and Python. For high volumes or several connected systems, the Enterprise plan is meant for that.

Files or API: which to choose

Development needed

File import
None; a saved export in your system
REST API
Yes; a small service or script

Who runs the plan

File import
A planner in the browser
REST API
Your system, automatically

Result goes to

File import
The planner user, then PDF or share link
REST API
Your system, as data

Manual adjustment

File import
Yes, in 3D
REST API
No; adjust in the planner if needed

Good for

File import
Daily planning by a team, starting out
REST API
High volume, fit checks at order entry, quoting
File importREST API
Development neededNone; a saved export in your systemYes; a small service or script
Who runs the planA planner in the browserYour system, automatically
Result goes toThe planner user, then PDF or share linkYour system, as data
Manual adjustmentYes, in 3DNo; adjust in the planner if needed
Good forDaily planning by a team, starting outHigh volume, fit checks at order entry, quoting

Many teams use both: the API answers the quick question ("how many trucks?") inside the order system, and planners build the final, adjusted plan in the browser for the dock.

Step by step: building an API integration

  1. 1Define the trigger. When should a plan be calculated: order entry, order release to the warehouse, or truck booking? Pick one to start.
  2. 2Map the fields. List where each request field lives in your system: vehicle dimensions in the TMS, item dimensions in the ERP, stop from the route. Decide what to do when a value is missing (block the request, or use a default and flag it).
  3. 3Convert units. Send centimetres and kilograms. If your master data is in millimetres, metres or pounds, convert in one place in your code.
  4. 4Group lines. Send identical handling units as one item with a quantity, keyed by a stable id such as the SKU or handling-unit type.
  5. 5Call the API with a Pro key from the Developer portal, using a test order you have already planned by hand in the browser.
  6. 6Compare the result with the hand plan: same items placed, similar utilisation, nothing in unplacedItems that should fit.
  7. 7Store what you need. Usually utilisation, total weight, the list of unplaced items and the number of vehicles; keep the full placements only if your system will display or print them.
  8. 8Handle "did not fit". Decide the action: a warning to the planner, a second vehicle (send settings for several vehicles), or a hold on the order.
  9. 9Go live on one flow, watch it for two weeks, then extend.

Tip

Keep the API key on your server, never in a web page or a spreadsheet that leaves the company. If a key leaks, revoke it in the Developer portal; it stops working immediately and you can create a new one.

A worked field mapping

A distributor’s ERP exports an order of 22 Euro pallets of drinks and 8 half pallets of snacks to one customer. The integration maps it like this:

ERP field: Truck type (TMS)

Value
Semi-trailer 1,360 × 245 × 270 cm, 24,000 kg
API field
container.length / width / height / maxWeight

ERP field: Item number

Value
DRK-EUR
API field
id

ERP field: Description

Value
Drinks, Euro pallet
API field
name

ERP field: Pallet size (mm)

Value
1200 × 800 × 1450
API field
length 120, width 80, height 145

ERP field: Gross weight

Value
780 kg
API field
weight 780

ERP field: Order quantity

Value
22
API field
quantity 22

ERP field: Stacking flag

Value
No
API field
stackable false

ERP field: Item number

Value
SNK-HALF
API field
id, with length 80, width 60, height 120, weight 160, quantity 8, stackable
ERP fieldValueAPI field
Truck type (TMS)Semi-trailer 1,360 × 245 × 270 cm, 24,000 kgcontainer.length / width / height / maxWeight
Item numberDRK-EURid
DescriptionDrinks, Euro palletname
Pallet size (mm)1200 × 800 × 1450length 120, width 80, height 145
Gross weight780 kgweight 780
Order quantity22quantity 22
Stacking flagNostackable false
Item numberSNK-HALFid, with length 80, width 60, height 120, weight 160, quantity 8, stackable

Weight check: 22 × 780 + 8 × 160 = 17,160 + 1,280 = 18,440 kg, inside the 24,000 kg payload. Floor check: a 13.6 m semi-trailer takes 33 Euro pallets in one layer, so 22 Euro pallets and 8 half pallets (each half the footprint, four pallet places) need about 26 places. The response should show everything placed and no unplacedItems; if it does not, look at the data before the algorithm.

Before you start

Get the manual process working first. A team that already plans in the browser knows which rules matter and which master data is wrong, and that knowledge is what makes the integration correct. Our 30-day implementation plan covers that stage, and the load planning software ROI article helps you decide whether development time is worth it for your volume. For a picture of the full process on road loads, see the road transport use case.

Frequently asked questions

Does EveryLoading have a ready-made SAP or TMS connector?+

No. It offers a REST API that any system able to send an HTTP request can call, and CSV/XLSX import for teams that prefer files. Ready-made connectors are on the roadmap, not available today.

Which API plan do I need?+

Any Pro account can create API keys in the Developer portal. For high volumes, several connected systems or a custom agreement, Enterprise is the right choice.

Can the API return a PDF of the load plan?+

Not at present. The API returns placement data in JSON; PDFs and share links are created in the browser planner.

Is cargo data sent to the API stored?+

An optimisation request is calculated and the result returned without saving the cargo as a plan. Only how often each key is used is recorded.

See it fit before the truck arrives.

Paste your packing list, pick the trailer, container or ULD and get a 3D load plan in the order your crew loads it.

Create free accountOpen the load planner

Load planning for retail and distribution · User manual

Planning your load?

See it fit in 3D before the truck arrives.

Create your free account

No card needed.

On this page

  • What data flows, and in which direction
  • Route 1: file export and import
  • Route 2: the REST API
  • Files or API: which to choose
  • Step by step: building an API integration
  • A worked field mapping
  • Before you start
  • FAQ

Published 19 November 2026

Keep reading

A 3D EveryLoading load plan of mixed paint pallets and non-stackable pallets in a 13.6 m semi-trailer

Operations & software · 18 November 2026 · 7 min read

Load Planning Software Implementation: A 30-Day Plan

A 30-day load planning software implementation plan: vehicle and cargo master data, pilot loads, training for planners and the dock, and how to measure results.

Read article →
A 3D EveryLoading load plan of a groupage part load of stacked EUR pallets, industrial pallets and crates in a semi-trailer

Operations & software · 15 November 2026 · 7 min read

Booking Cargo Space: Pallet Places, LDM, CBM and Weight

How to work out and book cargo space with a carrier or forwarder: pallet places, LDM, CBM, chargeable weight, and what the booking needs to avoid re-quotes.

Read article →
A 3D EveryLoading load plan of three shippers' pallets, crates and cartons consolidated in a 40 ft container

Operations & software · 14 November 2026 · 7 min read

Cargo Loading Software for Freight Forwarders

How freight forwarders use cargo loading software for quoting, consolidation, LCL and groupage, choosing containers and sharing load plans with shippers.

Read article →
EveryLoading

Online load planning for trucks, sea containers and air cargo. Works in your browser, nothing to install.

Company

Wolfiz LimitedOffice 5118, 321–323 High RoadChadwell Heath, Essex, RM6 6AXUnited Kingdomsales@everyloading.com+44 7308 515752

Product

  • Try Planner
  • Truck loading software
  • Free tools
  • Loading meter calculator
  • User manual
  • FAQ
  • Integrations
  • Roadmap
  • Developer API
  • Comparison

Use cases

  • Road transport
  • Sea freight
  • Air cargo
  • Manufacturing
  • Palletizing
  • Retail and distribution

Legal

  • Privacy Policy
  • Terms of Service
  • Sitemap
© 2026 Copyrights reserved by Wolfiz LTD.Powered by GiantBytes